Close the month. Not 200 spreadsheets.A robot prepares the job cost sheet for every closed production order. Your costing team reviews variances instead of extracting data.
Human review stays where it matters
Month-end summary · to costing lead Sent
One mail, the whole month
Cost sheets preparedProcessed
Variance over the thresholdReview list
Missing dataException
Goods moved after TECOMarked
Review rule Rule
Variance above 5% or ₹25,000, whichever comes first, goes to the review list.
Job cost sheets · at a glance
Current process estimates
180–220
TECO orders costed every month
10–12 min
per cost sheet by hand, if nothing is wrong
35–40h
manual effort saved every month
Estimated
20–30
orders typically needing a person
How it was done
Four reports, one Excel tab,for every single order.
Planned cost KKBC_ORD
→
Material issues MB51
→
Labour & machine confirmations
→
Overhead rate costing sheet
→
Excel template one tab per order
10–12 min × ~200 ordersMonth-end job costing took the 3-person team about 4 working days, mostly pulling reports and matching numbers rather than reviewing them.
How it works now
Every order costed. Only the outliers reach a person.
One robot reads four sources, builds every cost sheet and sorts each order into one of four outcomes.
When & what it readsWhat the robot doesWhere each order lands
Trigger
Month-end · every order with TECO status
SAP · KKBC_ORD
Planned vs actual by cost element
SAP · MB51
Actual material issues
SAP · Confirmations
Labour & machine hours
SharePoint
Overhead rate master
Software robotOne queue item per order
1
Extract the costs
Planned vs actual, material issues, activity confirmations
2
Apply overhead
Rate for the work centre from the master file
3
Build the cost sheet
Variance for material, labour, machine and overhead
4
Check the rule
Over 5% or ₹25,000, whichever comes first?
5
Save & report
OrderNo_Plant_MMYYYY.xlsx, then one summary mail
Within tolerance
Sheet saved in the month folder. No one needs to open it.
● Month folder
Variance flagged
Added to the review list in the summary mail.
● Costing analyst
Moved after TECO
Sheet prepared, but marked: numbers may still move.
● Costing analyst
Business exception
No confirmations, or work centre not in the rate master.
● Analyst / Finance
Summary mail→Costing lead→Reviews 20–30 orders, not ~200
Starts the runData the robot readsHandled automaticallyHanded to a person
Where the robot stops
Automation handles the work. People own the decisions.
No labour confirmations? Business exception: the analyst checks with production.
Work centre missing from the rate master? Finance updates it first.
Goods posted after TECO: the sheet is still prepared, but marked for the analyst.
Processed, flagged and failed counts arrive in one mail with the review list attached.
Why it works
Same SAP, same templates. Less copying.
Works through existing SAP reports and the team’s own Excel template
Every flag comes with its reason
Analysts open the flagged orders, not all of them
Your month-end business case
How many analyst hours does your costing close take?
Enter your own numbers to see the hours a robot could hand back each month. Share your workflow and we’ll turn it into a detailed estimate.
Example from this case~200 orders × 10–12 min ≈ 35–40 hours of manual prep every month
Calculate my month-end savings
For a detailed estimate, we’ll ask
Orders closed per monthMinutes per cost sheetYour variance ruleTeam size & cost
Quick estimate
prep handed back each month
orders a person still opens
hours back a year
yearly value of those hours
Estimate only: hours = orders × minutes per sheet. We refine it with your workflow.
Less extracting. More reviewing.
Move the costing team from assembling sheets to acting on the variances that matter.
Indicative benefits based on the client's current process estimates. Final savings and automation feasibility depend on SAP access, report consistency, master data quality and pilot validation. Client details withheld.